IGUS | energy chains
1167 e-loop ® e-loop ® | ELP | Load and break test igus ® performs application-specific tests in the in-house laboratory Load test of e-loop ® Continuous test of a completely harnessed e-loop ® with cable filling for 500t top drive. The test is carried out in the open air with all environmental influences as well as simulation of wind and vibration. Result : The test has run 150,000 double strokes. All influences due to weather do not a ff ect the functionality of the e-loop ® . Side impacts, bumps or vibration do not bother the e-loop ® . Break test of the e-loop ® Test setup: the e-loop ® is dropped from a height of 10 metres onto a safe and hits with full force. Result : The test proves that the e-loop ® withstands the impact without problems; its design is resistant to shocks and is shatterproof. igus ® o ff ers the e-loop ® as a fully harnessed readychain ® solution with cables and connectors. Everything fromone source including system guarantee Both videos online www.igus.eu/e-loop e-loop ® assembly instructions - find out how to assemble the e-loop ® with and without cables www.igus.eu/e-loop 3D CAD, configurators, service life calculators and more www.igus.eu/e-loop
Made with FlippingBook
RkJQdWJsaXNoZXIy MTU4MDI=